Alberta Processing Plant
Calgary, Alberta
New expansion to the existing building, which included a 93,000 lb/hr high pressure steam boiler for the rendering process and a 100,000 lb/hr high pressure steam boiler for the treatment of the process ventilation. Additional ventilation equipment and process cooling tower have been designed to assist the rendering process.
