Domestic Hot Water Heater Replacement – ACH
This project involved the replacement of the failing high efficiency domestic hot water heating units serving a large portion of the hospital. The system was also re-designed to improve operation and redundancy of the system. The DHW heaters were replaced while maintaining the functionality of the system. As a result, the implementation of the new equipment and piping was phased to ensure that there was always an adequate supply of DHW to the facility and the areas served.