Pier West – 660 Quayside Drive

  • Variable Refrigerant Flow (VRF) system serving commercial.
  • Four pipe fan coil system provides both heating and cooling within each suite.
  • Central gas fired boilers and modular water cooled chillers with custom fluid coolers to allow water side economizer free cooling.
  • Phase 1 – 496,000 sq. ft., Phase 2 – 320,000 sq. ft., Phase 3 – 11,000 sq. ft.
  • Phase 1 – 53-storeys, Phase 2 – 37-storeys, Phase 3 – 2-storey commercial
  • 665 units total
  • Expansive outdoor lounges with private dining room
  • Fitness facility
  • Underground parking

Project Gallery