Renert School

  • Phase one of this project included a fully completed based building mechanical system and the fit-out of four floors of the building. Phase two included the fit-out of the fourth floor and phase three included the fit-out of the fifth floor
  • The mechanical design included ducted supply and return with a mixture of displacement ventilation and overhead distribution systems
  • Each room included variable air volume boxes to control operations based on occupancy
  • A high-efficiency boiler plant provided heating throughout the building
  • A new cafeteria and full commercial kitchens
  • Gymnasium with 600 people capacity
  • New black box theatre with 140 seat capacity
  • Building management system
  • The project is designed based on NEBC 2011 and was able to achieve 18.8% more efficient building than the NECB similar school building